Apartments Oeverpolder Katwijk

The plot Oeverpolder is located in the central part of the Hoornespolder, a 1960s reconstruction area. In recent years, this district has undergone a transformation, where living is more focused on the public space and a clearer separation is made between public and private.

In the design for the new-build location, a U-shaped courtyard building was chosen, which in terms of architecture and grain size connects to the existing buildings. The green structure of the neighborhood is reinforced with the design. The transition between the residential building and the public space has been carefully designed. There are no garages, storage rooms and blind facades in the public space. The U-shaped building contains a total of 52 apartments of 53-88 m2. The building on Hoorneslaan has 4 storeys, the other two sides are 3 storeys high. The houses are all accessible via (widened) galleries in the courtyard, parking is partly in the courtyard and partly on public land, on the street.

The masonry architecture is in line with previous transformations on Hoorneslaan, but also fits in well with the existing modern reconstruction architecture of, for example, the adjacent Pniëlkerk. Due to the sloping boundary of the plot on Hoorneslaan, the building block has been given characteristic staggered façades here. It is an all-round designed building that at the same time has a new and unique character, but also fits well in the neighborhood.

Architects Ronald Knappers, Thomas Gillet
Client(s) Dunavie Katwijk
Related

In Wassenaar, 40 duplex houses owned by the housing association St. Willibrordus have been replaced by 86 social rental dwellings, primarily intended for starters and seniors.
The site of the new social housing lies within a village extension from the 1960s. At the time, this was the northernmost district of Wassenaar — spaciously laid out, with views over meadows and farmhouses. In designing the plan for the replacement housing, we built upon the core qualities of the existing neighborhood: generous street profiles, front gardens, and abundant greenery.

The new social housing is distributed across six buildings arranged around a shared courtyard garden. By removing the Stompwijckstraat that previously ran between the plots, space has been created to accommodate residents’ parking within the block, while also allowing room for the communal garden. Along this garden, a community facility has been incorporated.

The buildings feature a formal frontage with so-called ‘zoom dwellings’ on the ground floor — shallow homes with their entrance and a small front garden facing the street. The rear sides adjoin the parking area, which is located beneath an open, green deck. The existing tree structure of the area has been preserved. To ensure privacy for the front gardens, a green strip separates them from the sidewalk. The upper-level homes are accessed via wide external galleries.

The urban design was created by Studio VVKH. To ensure the buildings align in scale with the surrounding structures along the long streets, the façade of the top (third) floor is set back slightly from the building line. The balconies create a connection with the street and are subtly angled to optimize orientation toward the sun. On the northern park side, the buildings are more robust in character, with their height responding to the adjacent apartment block.

In the heart of the Vijfhoek, a picturesque neighborhood in the historic center of Haarlem, stands a large building erected in 1908 by the Waaning company as a factory for Haarlemmer Olie. The building has since been designated a municipal monument. The section facing the Doelstraat originally served a representative function: richly ornamented office spaces were used to receive visitors and convince them of the remarkable qualities of this “miracle oil.” The rear section contained storage and staff quarters, adjoining an inner courtyard with the boiling room, where the sulphur-rich oil was produced a few days each year.

Since the 1980s, the building has been used as a residence. The division between the front and rear sections has been removed, yet the historic atmosphere remains tangible. The new owner asked us to develop a plan to prepare the entire building for a new century—energy-efficient, comfortable, and focused on the enjoyment of living, both along the street and around the inner garden. The boarded-up garage doors have been replaced with generous glazed folding doors. Using flax insulation, the building is insulated from within; new glazing is installed, and the roof is insulated from the outside. Heat pumps and solar panels provide sustainable energy generation. In close consultation with the Heritage Department, all characteristic elements are preserved—allowing the new residents to begin the next chapter in the rich history of this building.

In close collaboration with restoration contractor Burgy, EPOS Advies, and energy consultancy Kroon, a plan of approach was developed. Construction began in February 2024.

Urban development and architectural integration “Vomar” location, corner of Abraham van Rooijenstraat and Maarten Kruijtstraat in Noordwijk

From an urban planning point of view, the contours and height of the building plan were determined by the municipality of Noordwijk. The plan clearly defines the streets Abraham van Rooijenstraat and Maarten Kruijtstraat, in line with the existing street profiles. Gasthuissteeg will also have a clear boundary with this building plan.

The main mass has an intermediate scale between two worlds present in the environment. On the one hand, there is the smaller-scale village development of the Hoofdstraat and on the other hand, the large-scale hotel development. The mass of the new building block to be built is 3 storeys high plus a roof storey. It is articulated into a number of volumes, softening the scale of the building block. These volumes are made independent by different colors of masonry and roof finishes. With a play of rhythm between balconies, windows, tires, roof moldings and a green-copper-colored roof, the building blends in well with the seaside resort architecture of the environment. The mass on the Gasthuissteeg is 2 storeys high. It has a green facade with window openings. On the north side of the plan, the existing firebreak will be closed and the buildings will close directly on the adjacent plot.

The plan is mainly sustainable because of the triple land use. The building block has an underground floor, on top of that a storey layer, above that a parking deck for the houses and 42 houses.

Abraham van Rooijenstraat is an important access road. That is why functions such as the entrance to the underground parking garage, the entrance to the parking deck on the 1st floor in front of the houses, and the entrance to the expedition have been made here. The Kruisstraat will become more traffic-calmed. This will be the world of shopping as it is at the Hoofdstraat. This is where the shopping functions will be located, which are accessed via two clear entrances at the corners. These entrances are clearly visible from the Hoofdstraat and from the Grent.

The entrance to the houses is on the north side. This will give the existing loading and unloading yard, where other residential accesses are located, a quality impulse. The gallery facade, which is hardly visible from the public space, is conceived as a veranda world. It's a light world of painted wood.