Housing Puur Wonen, Kloplocatie Kerk en Zanen Alphen ad Rijn

"PURE LIVING"; the winning housing concept for the ‘Klop’ location in Alphen aan den Rijn

Together with Bemog Projectontwikkeling we have developed a vision for 3rd stage of this location in Alphen aan den Rijn. The location is the final piece of the residential area of ​​Kerk en Zanen. It is located on the edge of the Green Heart, with beautiful sight lines on the polders. From the N11, the peripheral buildings will become the first sight of Alphen aan den Rijn.

A sustainable plan has been developed for this location (zero on the meter), which in terms of architecture fits seamlessly into the green environment. The 'Pure Living' concept consists of 40 terrace apartments, 20 water houses, 16 linked villas, a utility and neighborhood facility and a built-in parking facility. The peripheral buildings with the linked water houses and the two apartment buildings form the green boundary of the polder landscape of ‘het Groene Hart’. The greenery of the polder is visually extended into the buildings by giving each apartment its own (terrace) garden. The semi-detached villas are positioned in various ways and are adapted according to buyer's wishes.

Architects Ronald Knappers, Thomas Gillet
Client(s) Bemog Projectontwikkeling
Related

In the heart of the Vijfhoek, a picturesque neighborhood in the historic center of Haarlem, stands a large building erected in 1908 by the Waaning company as a factory for Haarlemmer Olie. The building has since been designated a municipal monument. The section facing the Doelstraat originally served a representative function: richly ornamented office spaces were used to receive visitors and convince them of the remarkable qualities of this “miracle oil.” The rear section contained storage and staff quarters, adjoining an inner courtyard with the boiling room, where the sulphur-rich oil was produced a few days each year.

Since the 1980s, the building has been used as a residence. The division between the front and rear sections has been removed, yet the historic atmosphere remains tangible. The new owner asked us to develop a plan to prepare the entire building for a new century—energy-efficient, comfortable, and focused on the enjoyment of living, both along the street and around the inner garden. The boarded-up garage doors have been replaced with generous glazed folding doors. Using flax insulation, the building is insulated from within; new glazing is installed, and the roof is insulated from the outside. Heat pumps and solar panels provide sustainable energy generation. In close consultation with the Heritage Department, all characteristic elements are preserved—allowing the new residents to begin the next chapter in the rich history of this building.

In close collaboration with restoration contractor Burgy, EPOS Advies, and energy consultancy Kroon, a plan of approach was developed. Construction began in February 2024.

Villa Meijendel takes its name from the nature reserve in which it is located, where a forest meets a valley of dunes. The house is constructed from concrete and set into the side of a sandy slope. The building's design aims to create a dialogue with its surroundings, both through the way the form and materials engage with the landscape, and through the use of glass to provide views out from and into the house. 

The boxy geometric structure is entirely clad in charred timber, creating a textured black surface that appears different depending on how sunlight falls on it. The exterior finish, inspired by the ancient Japanese shou sugi ban technique, also helps to preserve the wood. Sometimes the house is almost invisible against the dark edge of the forest, sometimes it sparkles in the sunlight because of the glittering charred wood, as such forming a background for the play of shadows of tree trunks and branches. The villa hides and reveals itself in the landscape.

The property has its entrance on a middle level accommodating an office and two bedrooms. Stairs ascend to an open-plan kitchen and living space, and drop down to a master bedroom and gym room.

The living room features a full-height corner window that looks out through the trees towards the dune valley. A lower window facing to the rear and a large glazed surface lining the adjacent double-height circulation area face out onto the forest. At the far end of the first floor, sliding glass doors lead out from the kitchen onto a terrace.

The material palette –concrete, steel and anodised aluminium– was chosen to complement the tones and textures of the surrounding environment. Each material is applied in a raw, untreated form. Internally, the walls are finished with smooth concrete, while the rough-sawn Douglas fir beams supporting the ceilings feature a distinctive grain.

West 8, Adriaan Geuze, is responsible for the garden design.

Photography is by Christian van der Kooy

In close consultation with the municipality of Leiden, VVKH has developed an urban development plan for the redevelopment of two office buildings on Verbeekstraat in Leiden. What is currently a densely populated area dominated by cars will soon become a vibrant, green, and people-friendly residential area. In line with the municipality's high-rise vision, several buildings will be added along Plesmanlaan, creating a new cityscape along this access road to the city. Together with the developments at the Bio Science Campus on the opposite side of the road, this will create a new and innovative urban district.

The Plantsoen in Leiden is well known for the historical appearance of both the city park (1836) and the houses of the last quarter of the 19th century. The park was originally landscaped on the edge of the city in the place of an old defense belt. At the entrance of the park at the east side the monumental building Plantsoen 1 – 3 is redeveloped in a complex with 6 apartments. The apartments of about 150 m² are provided with all luxury and comfort, such as a private indoor garage, spacious roof terraces and an elevator, while retaining the historical look and value of the building. Redevelopment also applies to sustainability; obtaining Energy label A. Exterior facades, window frames and roof are additionally insulated. The houses are underfloor heated and solar panels are provided on the roof.

The municipal monument at Plantsoen 1 – 3 is divided over three floors and a basement.  The property at number 1 was originally a fully detached house, number 3 was part of a block of 3 houses. Both buildings date from 1875 and were connected in 1957 and converted into one large nursing home. In this function change, the original qualities have largely been lost. The round expansion at number 1 dates from 1993.

In the new layout with 6 apartment, the monuments are restored to their former glory by restoration contractor Burgy from Leiden. The façade of the intermediate building is renewed and aligned with the monuments. The existing façade of the round building is finished with a bronze wall cladding, a ‘veil‘ with a leaf motif. This pattern is inspired by the leaf motifs and decorations of the 19th century, which can still be found in various places along the Plantsoen. The round with ‘veil’ becomes a special recognition point in the inner city.

Each apartment has both rooms in the monumental area as well as in the newer parts. The interior of the monumental buildings is provided with appropriate details to bring back the historical character as much as possible. This specific part is provided by Verlaan & Bouwstra architects from Vianen.

On the inside buyers have a lot of freedom of choice; they can choose for an even richer historical finish with wall tension, panelling and en-suite layout or a tight, modern finish and layout; both are possible. Each apartment is unique, has its own layout and its own character. Only the view is the same for all apartments; they all look out over the beautiful monumental city park the Plantsoen at the town canal.

The redevelopment was completed in July 2018.

aerial view by contractor